22PROC010082093
ΜΕΣΟΓΕΙΑΚΟ ΓΡΑΦΕΙΟ ΠΛΗΡΟΦΟΡΗΣΗΣ ΓΙΑ ΤΟ ΠΕΡΙΒΑΛΛΟΝ ΤΟΝ ΠΟΛΙΤΙΣΜΟ ΚΑΙ ΤΗΝ ΑΝΑΠΤΥΞΗ / ΤΜΗΜΑ ΠΡΟΓΡΑΜΜΑΤΩΝ
technical intervention for the reuse of the effluent of wadi shuayb wastewater treatment plant for solar powered irrigation of three farms, al-salt, jordan
the call concerns the technical intervention in jordan that will be increasing the utilisation of the wadi shuayb wastewater treatment plant outflow, powered by solar energy, for efficient irrigation while promoting entrepreneurship opportunities for local, particularly female, farmers in agribusiness. the project’s intervention in wadi shuayb will demonstrate the technical and economic feasibility of the wefe nexus approach coupled with low-cost and low-energy nature-based solutions for water treatment prior to be reused in farming while contributing to the local water budget, thus decreasing consumption of potable water needed for domestic uses. eur 190.000* inclusive of all taxes *the final total amount will be determined upon measuring of the total works performed
ΜΕΣΟΓΕΙΑΚΟ ΓΡΑΦΕΙΟ ΠΛΗΡΟΦΟΡΗΣΗΣ ΓΙΑ ΤΟ ΠΕΡΙΒΑΛΛΟΝ ΤΟΝ ΠΟΛΙΤΙΣΜΟ ΚΑΙ ΤΗΝ ΑΝΑΠΤΥΞΗ / ΤΜΗΜΑ ΠΡΟΓΡΑΜΜΑΤΩΝ
technical intervention for the reuse of the effluent of wadi shuayb wastewater treatment plant for solar powered irrigation of three farms, al-salt, jordan
the call concerns the technical intervention in jordan that will be increasing the utilisation of the wadi shuayb wastewater treatment plant outflow, powered by solar energy, for efficient irrigation while promoting entrepreneurship opportunities for local, particularly female, farmers in agribusiness. the project’s intervention in wadi shuayb will demonstrate the technical and economic feasibility of the wefe nexus approach coupled with low-cost and low-energy nature-based solutions for water treatment prior to be reused in farming while contributing to the local water budget, thus decreasing consumption of potable water needed for domestic uses. eur 190.000* inclusive of all taxes *the final total amount will be determined upon measuring of the total works performed